Chestnut Grove Care Home Refurbishment, Belfast
Refurbishment of the 2-storey ‘step-down’ care facility which provides health and social care for up to 44 residents.
The planned refurbishment works are to the Eastern Wing of both the ground and first floor and require reconfiguration of the existing layout to reduce the number of bedrooms in order to add new ensuite facilities.
Killowen Contracts scope of work includes demolitions to modify window and door openings plus the addition of new stud partitioning; associated M&E upgrades including the reconfiguration of two storerooms adjacent to the existing plant spaces on the ground floor; replacement of 2000L Cold Water Storage Tank in the roof space and removal of existing; plus alterations to existing foul drainage and creation of new drainage.
Photo: Courtesy of BHSCT