Healthcare Projects
Check out all the latest and completed projects. For a free quotation you can contact Killowen Contracts on Tel: 44 (0)28 417 53378  or email construction@killowencontracts.co.uk

  Belfast City Hospital
- Belfast Health & Social Care Trust
  Alterations to A&E Entrance
- Craigavon Area Hospital
  Carlingford Lodge Nursing Home
- Murdock Property Group/ Priory Group
  Royal Jubilee Maternity Hospital - Refurbishment of Existing Ward D
- Belfast Health & Social Care Trust
  Belfast City Hospital - Refurbishment of North Ward
- Belfast Health & Social Care Trust
  Antrim Area Hospital - Refurbishment of Maternity Wards
- Northern Health & Social Services Trust
  Royal Group of Hospitals - Isolation Rooms
- Belfast Health & Social Care Trust
  fads
- fasdf


Royal Jubilee Maternity Hospital - Refurbishment of Existing Ward D

   
Client:
Architect:
Belfast Health & Social Care Trust
Hamilton Architects
   
Project Summary:

Works were carried out on the Refurbishment of Ward D at the Royal Maternity Hospital between April and May 2009 at a value of £410,000.
The hospital remained in full operation throughout the duration of the works, and therefore extreme care was taken by Killowen Contracts Ltd. to ensure the Health, Safety and Welfare of the occupants both in and around the building.

   
Project Description:

The construction work carried out generally comprised the alteration of existing rooms with the erection of metal stud partitioning and the replacement of existing floor and ceiling finishes. All windows and doors were replaced and redecoration works were carried out. All electrical and mechanical works within the ward were upgraded as were all associated internal and external drainage connections.

Given the location and nature of the works, any construction activity thought to create high noise levels had to be carried out at specific times in order to keep disruption to patients and employees to an absolute minimum. As a further measure all tools, where possible were equipped with efficient silencers.

The fact the works were ongoing within a hospital environment, cleanliness was of paramount importance. Dust sheets and floor coverings were put in place to contain all debris etc. and it was the responsibility of Killowen Contracts Ltd. to ensure all waste was removed from the site at regular intervals to ensure the site safety and maintain a reasonable level of site cleanliness.

The works were completed on programme and within budget.

   